Large fabric
After tapping, depending on the level of material used at the location to be repaired, take an appropriate amount of large fabric, place it in a hopper or other equipment, and shake the furnace to shake the location to be repaired to the bottom, and place the area to be repaired in a horizontal position during the repair process , Put in the large fabric immediately, and the large fabric will be bonded to the furnace body to complete the repair process under the influence of the furnace temperature.
Physical and chemical indicators: magnesium>75% carbon>5%, working temperature:>1100 degrees, sintering time: 30 minutes.
Physical and chemical indicators
mgo | sio2 | cao | fe2o3 | al2o3 |
≥86% | ≤6% | <2% | <1.5% | <1.5% |
Contact: Manager Hou
Phone:15141721000/18340699933
Fax: 5283555
Customer Service: 0417-5289566
Email: 373633791@qq.com
Address: Nanlou Development Zone,
Dashiqiao City, Yingkou City
message.Scan and follow